Build Progress Wk20

NB01 Is now the right way up with all it’s top coats on. All internal items are in build or have been completed. NB01 requires it’s top rail to be varnished. The seats and floorboards are being oiled and varnished before being fitted inside the hull.  The nameplates are at Douglas Seton, who is very …

Build Progress Wk19

NB001 only requires it’s top coat to be applied before turning over again to install seats and floor boards. Wood has been delivered to the shed for floor boards and sheer rubbing rails. NB002 The clean-up of the inside of hull is progressing well. [flickr photo=14118848147 size=medium]

Build Progress Wk18

NB001 has now had it’s hull faired and sanded. The outside hull will start to be painted this week. The manufacture of seats and beams has now been completed which will allow sanding and varnishing to commence. NB002 has had it’s keel fitted and is currently lying in Bay B. The clean-up of the inside …

Build Progress Wk17

NB001 inside hull now painted. Ready for turnover for painting of outside of hull. The hull is now ready to placed back on the building frame to have it’s outside faired, sealed and painted.  The manufacture of seats and beams are progressing well and should be ready for varnishing next week..  The keel for NB02 …