Build Progress Wk12

General:  Things moving along at a nice pace again on both boats with oar manufacture now commenced.  The air temperature is steadying rising which should allow the painting to commence once NB001 inner rail and frame tops have been installed.
 
Details:  NB001 top inner rail is progressing well as its 2/3 installed.  NB002 is having plank 4 (both sides) bevelled and ready for installation during Wk 13.